
UK firefighters called to one lithium-ion battery fire every five hours
UK firefighters respond to a lithium-ion battery fire every five hours amid rising incidents.

Cambridge South station will open in late June, becoming the first fully branded Great British Railways station. It will provide direct train services to London, Brighton, and Stansted airport, with an expected 1.8 million annual passengers.
Mentioned in this story
The delayed Cambridge South station will finally open in late June – and become the first station to be given full Great British Railways branding, the government has announced.
The station sits beside the city’s Biomedical Campus, Europe’s largest medical research centre, and will connect it with direct trains to London, Brighton and Stansted airport, as well as up to nine trains an hour to the centre of Cambridge itself.
Services will begin calling at Cambridge South on Sunday 28 June, the Department for Transport said, with 1.8 million passengers expected annually.
The DfT said the adjacent Biomedical Campus was forecast to contribute £18.2bn to the UK economy by 2050, with employees likely to double to 40,000, boosted in part by the new transport links.
The station, the city’s third, was supposed to open in 2025 but was delayed, partly due to the collapse of a contractor responsible for fitting out the electrics.

The Great British Railways livery. Photograph: Department for Transport
The rail minister, Peter Hendy, said Cambridge South, which was built with £250m of government investment and a small private sector contribution, would “open up access to jobs, homes and world-class facilities for people across the region, boosting the growth of the Biomedical Campus as one of the most important engines of growth in the country”.
He added: “As the first new Great British Railways branded station, the opening is an important milestone for our railways and a sign of the real change public ownership will deliver.”
Jeremy Westlake, chief executive for Network Rail, said the station would “significantly improve travel and connectivity for campus staff, visitors, and the wider community for many years to come”.
He added: “Thousands of people have worked tirelessly on this fantastic project to build a modern, accessible and sustainable station that reflects the excellence of the work that is being undertaken in Europe’s largest biomedical facility.”
The station’s permanent signage will be in GBR brand colours – a design drawn up by a small group of ministers and advisers within the DfT to save money, with . The station will also be displaying the more professionally acclaimed .
Cambridge South station is set to officially open on Sunday, June 28.
Cambridge South station will connect to London, Brighton, and Stansted airport, as well as provide frequent services to central Cambridge.
The station is expected to serve approximately 1.8 million passengers each year.
The Biomedical Campus is forecasted to contribute £18.2 billion to the UK economy by 2050, with employee numbers potentially doubling to 40,000.

UK firefighters respond to a lithium-ion battery fire every five hours amid rising incidents.

UK households are bracing for a new cost of living crisis as consumer confidence plummets.

A hantavirus outbreak on a cruise liner has led to fatalities and a global response effort.

Trump's upcoming visit to China marks a pivotal moment for US-China tariffs.

Arctic air is set to bring a cold snap to the UK midweek, replacing recent warmth.

Wayne Rooney praises VAR for disallowing West Ham's late equaliser in Arsenal's win.
See every story in News — including breaking news and analysis.

A train sports the Great British Railways livery. Illustration: Dovetail Games
It will also eventually serve the East West Rail line which is being built across to Oxford, although the delayed start of initial services between Milton Keynes and Oxford and uncertainty about the exact route is likely to mean direct trains between the two university cities will not start in 2030 as hoped.
Meanwhile, HS2 Ltd has announced contracts to develop the high-speed railway’s control centre and rolling stock depot in Birmingham.
It said the new hub at Washwood Heath, to be built under an £856m contract won by a joint venture of Taylor Woodrow and Aureos Rail, would support more than 1,000 jobs.
The contract award was assessed by an independent review panel, as the government and HS2 attempt to ensure efficient delivery and costs on the project, whose overall budget is being reassessed.
Hendy said it was another milestone in getting HS2 back on track, and that the railway would “create thousands of jobs across the West Midlands – from the construction teams transforming this former industrial site, to the skilled workforce who will operate this state-of-the-art facility for decades to come.”